Table Of Contents
![Oracle Primavera Unifier poster](/img/1.gif)
Latest update [menu]
•Support for the device camera to be the only source of attachments for business process records and line items. This requires an additional setup in the business process configuration in the server.
•Usability improvements in Tasks filters
•Technical improvements and bug fixes
Description [menu]
By installing this app, you agree to the End User License Agreement terms at
https://docs.oracle.com/cd/F11146_01/EULA/en/EULA.htm
The Oracle Primavera Unifier mobile app is the perfect companion for Unifier users on the go. Project managers and field users can use the Unifier mobile app to view, update, and collaborate on projects. Users can manage their tasks, create business process records, and review documents. The Unifier mobile app supports offline access, allowing field users to continue working on their downloaded project data and documents while offline.
Unifier mobile app requires you to have a valid license for Primavera Unifier 17.7 and above. Oracle recommends that you upgrade your Primavera Unifier installation to the latest version to utilize all the features of the mobile app, as some of the recent features are supported only on the latest version of Primavera Unifier.
Features
• Manage your assigned tasks and update your task progress anywhere, anytime.
• Work on your downloaded company and project data without network connectivity.
• Synchronize locally saved changes with the Unifier server, once network connectivity is available.
• Create new business process records and add line items.
• Attach picture, audio, and video files to a business process record, line item, or task.
• Use supported pickers, QR code, bar codes, auto-population, and formula-calculation on forms to minimize data entry errors.
• Access frequently-used business processes faster by adding them as tiles to the Home screen.
• Access, and save company and project-level documents.
• Use the application in any of the 12 supported languages.
Additional Information
• Oracle recommends that you always synchronize your locally saved changes with the Unifier server before upgrading to the latest version of the mobile app.
• The Unifier mobile app for Android supports Android OS version 5.0 and above.
• Use the demo mode to evaluate the app without a license or connection to Primavera Unifier.
• Enable business processes for mobile app use, and the required access permissions to view the business processes in your mobile app.
• Contact your Unifier administrator if you have any questions.
How to install Oracle Primavera Unifier APK for Android [menu]
Download Oracle Primavera Unifier APK file (com.oracle.cegbu.unifier_139_18001536.apk) from SameAPK.com, then follow these steps:
Update Phone Settings
- Go to your phone Settings page
- Tap Security or Applications (varies with device)
- Check the Unknown Sources box
- Confirm with OK
Go to Downloads
- Open Downloads on your device by going to My Files or Files
- Tap the APK file you downloaded (com.oracle.cegbu.unifier_139_18001536.apk)
- Tap Install when prompted, the APK file you downloaded will be installed on your device.
How to install Oracle Primavera Unifier APK on Windows 7/8/10 or MAC PC? [menu]
Download Oracle Primavera Unifier APK file(com.oracle.cegbu.unifier_139_18001536.apk) from SameAPK.com to your PC (ex: /Users/xxx/Downloads/(com.oracle.cegbu.unifier_139_18001536.apk)), then follow these steps:
Using Emulator:
- Download And Install one Emulator Softwares (Ex: Bluestacks, GenyMotion, NoxPlayer)
- Simple install APK on PC by drag and drop file com.oracle.cegbu.unifier_139_18001536.apk on Emulator screen
Oracle Primavera Unifier APK Pros & Cons [menu]
Pros
- This app is safe, it's not require high risk permissions
- Compatible with 64-bit device (some android device and current Bluestacks)
Cons
- No best performance On PC (Windows, MAC) (because it's not exists X86 variant)